Editing runs from Run Planning after selection in the NextSeq 1000/2000 control software
For Cloud and Hybrid run modes on the NextSeq 1000/2000, runs are planned in Run Planning in BaseSpace Sequence Hub (BSSH) and selected from a list of planned runs in NextSeq 1000/2000 control software.
If a run planned in Run Planning must be edited after selection in the NextSeq 1000/2000 control software, exit the run setup on the NextSeq 1000/2000 control software interface and edit the planned run from Run Planning in BSSH.
It is required to exit out of the planned run on the NextSeq 1000/2000 control software because this will release the run from the locked "Ready to Sequence" state to the editable "Planned" state in Run Planning.
For any feedback or questions regarding this article (Illumina Knowledge Article #3205), contact Illumina Technical Support techsupport@illumina.com.
Last updated