Pre Run Check Troubleshooting on the MiniSeq
If the MiniSeq pre-ruck checks do not pass, follow the guidance below for the check or checks that did not pass.
General/reagent checks
Doors closed.
Make sure doors closed.
Power cycle\* if issue persists.
Consumables loaded.
Ensure consumables are properly loaded.
Power cycle\* if issue persists
Required Software.
Verify that the proper software/module is installed.
Instrument and network disk space checks (the control software will provide a warning if the free storage is below 100Gb).
Clear disk space from the D:\ drive.
Clear disk space from the network output location, if needed.
Network connection.
Confirms network status and physical network connection.
Check read/write permissions, availability of network location, and Ethernet plug.
Temperature
Temperature ramp: checks ramp of flow cell heater plate.
Power cycle\* and retry the pre-run checks.
\*\*Temperature sensors.
Power cycle\* and retry the pre-run checks.
\*\*Fans
Power cycle\* and retry the pre-run checks.
Imaging System
\*\*Imaging limits: sends stage to sensor limits.
Power cycle\* and retry the pre-run checks.
\*\*Z step-and-settle: checks the ability of z-stage to move and stop moving in a set time.
Power cycle\* and retry the pre-run checks.
Bit Error rate: checks camera circuits working.
Power cycle\* and retry the pre-run checks.
\*\*Flow cell registration: checks if the flow cell is in the correct imaging position.
Clean and re-seat flow cell and check gaskets.
Power cycle\* and retry the pre-run checks. If the checks do not pass, try a new flow cell.
Reagent Delivery
\*\*Valve response: tests the accuracy of valve and pump syringe rate movements.
Power cycle\* and retry the pre-run checks.
Pump: moves pump syringe to min and max positions.
Power cycle\* and retry the pre-run checks.
Note: Pre-run checks will not check flow rates, so always visually inspect the flow cell gaskets prior to loading.
\*For further information, search for Knowledge Base article How to Power Cycle the MiniSeq.
\\ These checks are also performed during the system check process.
If any pre-run check fails after a full power cycle, contact Illumina Technical Support.
For any feedback or questions regarding this article (Illumina Knowledge Article #1214), contact Illumina Technical Support techsupport@illumina.com. |
Last updated